News Articles and Ephemera
Title: | Makeover for an institution |
---|---|
Author: | McCaffrey, Jim |
Source: | Main Line Life |
Date: | 8/11/2004 |
Folder/Item #: | Churches-PRESBYTERIAN-Bryn Mawr Presbyterian Church (1); 29 |
Notes: | |
Abstract: | Replacing the existing pipe organ has led to a major renovation of the sanctuary-accoustical improvements, air conditioning, new sprinklers, etc. to the tune of $6.8 million |